Skip to main content

    April 2026: New National Minimum Wage rates now in effect. Check your pay →

    Disputes

    Confirmation of Change of Scope / Cancellation -- Payment for Work Done

    Low risk

    General use — safe to send as-is once you've filled the gaps.

    Open this template

    Copy to clipboard, or download as Word or PDF.

    Format: Document (Word / PDF) · Downloaded 0 times

    When to use this

    • The client has stopped or changed the job mid-way through
    • You need to confirm what work was completed and calculate the amount due
    • You want a written record of the scope change and its financial impact