Extension of time / delay notice (JCT and NEC versions)
Low risk
General use — safe to send as-is once you've filled the gaps.
Open this template
Copy to clipboard, or download as Word or PDF.
Format: Document (Word / PDF) · Downloaded 0 times
When to use this
- •You need to claim an extension of time because of delays outside your control
- •Bad weather, late information or client changes have pushed the programme back
- •You want a formal delay notice that works for both JCT and NEC contracts