    Extension of time / delay notice (JCT and NEC versions)

    Low risk

    General use — safe to send as-is once you've filled the gaps.

    Open this template

    Copy to clipboard, or download as Word or PDF.

    Format: Document (Word / PDF) · Downloaded 0 times

    When to use this

    • You need to claim an extension of time because of delays outside your control
    • Bad weather, late information or client changes have pushed the programme back
    • You want a formal delay notice that works for both JCT and NEC contracts