    Extension of time / delay notice (JCT and NEC versions)

    Low risk

    General use — safe to send as-is once you've filled the gaps.

    Open this template

    Free to download — we just need your email, region and trade. No name, no company, no spam.

    Format: Document (Word / PDF) · Downloaded 0 times

    When to use this

    • You need to claim an extension of time because of delays outside your control
    • Bad weather, late information or client changes have pushed the programme back
    • You want a formal delay notice that works for both JCT and NEC contracts
    ← Browse all templates

    Important disclaimer

    SiteKiln provides general guidance only. Nothing on this site — including our guides, tools, templates and document hub — is legal, tax, financial or professional advice.

    Every situation is different. Laws, regulations and industry standards change. You should always check with a qualified professional before making decisions based on what you read here.

    We do our best to keep information accurate and up to date, but we cannot guarantee it is complete, correct or current. SiteKiln accepts no liability for actions taken based on the content of this site.